WORK FOR THE NEXT TWO NIGHTS ON 71/670
No closures on 71 or 670 this weekend
THURSDAY, MAY 16– (NEW)
At 8 p.m., the ramp from I-670 west to I-71 south will be closed. Traffic will be detoured to SR 315 south to I-71 south.
The ramp from Jack Gibbs Blvd. to I-670 west will also be closed.
At 9 p.m., the ramp from I-670 east to I-71 south will close. Traffic will be detoured to I-670 east to Leonard Ave. to I-670 east to SR 315 south to I-71 south.
The ramp from 11th Ave. to I-71 south will also close.
At 9 p.m., I-71 south will be reduced to one lane.
At 10 p.m., I-71 south will be forced to exit to I-670 west to SR 315 south to I-71 south.
The closures (above) are necessary for bridge work.
At 11 p.m., I-670 east will be reduced to one lane between Cleveland Ave. and I-71 for guardrail repair.
By 3 a.m., FRIDAY, both lanes of I-670 east will be open.
By 5 a.m., FRIDAY all ramps will be open and two lanes will be maintained on I-71 and I-670.
(NOTE) FRIDAY May, 17 – The only closures will be three ramps. There will no lanes closed or restricted on I-71 or I-670.
At 8 p.m., the ramp from I-670 west to I-71 south will be closed. Traffic will be detoured to SR 315 south to I-71 south.
The ramp from Jack Gibbs Blvd. to I-670 west will also be closed.
At 9 p.m., the ramp from I-670 east to I-71 south will close. Traffic will be detoured to I-670 east to Leonard Ave. to I-670 east to SR 315 south to I-71 south.
By 5 a.m. SATURDAY, all three ramps will be open.
Up-to-date traffic and construction information, 24-hours a day, along with information about I-70/I-71 Corridor can be found at www.odot71670.org.
Find us on Facebook: http://www.facebook.com/ODOT71670
Follow us on Twitter: http://www.twitter.com/ODOT71670
###
For more information contact: Nancy Burton, at 614-205-3131